The City of Port St. Lucie has awarded a contract to Accurate Drilling Systems, Inc. for the Western Raw Water Main Construction Project. The project involves the installation of approximately 2,600 LF of 30 inch PVC pipe, 3,780 LF of 24 inch PVC pipe, 800 LF of 16 inch PVC pipe, and 340 LF of 12 inch PVC pipe, along with other related work. The contract started on December 4, 2023, and is expected to be completed by November 12, 2025. The total budget for the project is $7,495,675.50.
• The project includes the installation of PVC pipes of various sizes.
• The contract includes site restoration, testing, flushing, and pressure testing of the raw water main.
• The contractor is required to obtain all necessary permits and comply with permit conditions.
• The project is expected to be completed within 700 days.
• The contract value is estimated to be $7,495,675.50.