Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›Frame Park Formal Gardens Pathway, Irrigation And Drainage…

Awarded contract·City of Waukesha·Wisconsin

Frame Park Formal Gardens Pathway, Irrigation And Drainage System Improvements

$175kSingle Award
Contract source

Description

This procurement concerns the rehabilitation and improvement of the Frame Park Formal Gardens Pathway, including irrigation, drainage, grading, and pavement work. The scope lists 22 core line items—traffic control, temporary fencing, removal of existing sidewalks and drainage, grading, base‑course aggregate, limestone screenings, clean‑out drains, PVC storm‑sewer pipe, field stone with geotextile, concrete sidewalk, topsoil/fertilizer/seed, sod, irrigation system installation, and brick edging. Two optional paving alternatives are offered: permeable precast concrete unit pavers and flexible porous pavement, each raising the total bid amount. The base bid totals $174,493, while the alternatives bring the totals to $238,365 and $253,975 respectively. All‑Ways Contractors, Inc. submitted the detailed unit‑price bid, but no award decision is recorded. The solicitation was posted by the City of Waukesha, Wisconsin, and bids were received on 11 April 2025. The project falls under municipal park‑improvement and infrastructure‑renewal activities, involving civil‑construction, drainage, and landscaping services. • Core civil works: demolition, grading, base course, drainage and storm‑sewer pipe installation. • Pavement alternatives: standard concrete sidewalk vs. permeable precast concrete or flexible porous pavement. • Landscape components: topsoil, seed, sod, irrigation system, and brick edging. • Financials: base bid $174,493; alternatives $238,365 and $253,975.

Attached files

Key dates

Bids closed
4/11/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110

Contract value

$174,500

The bid tabulation provides explicit totals for three pricing scenarios: the base bid at $174,493, Alternative #1 (permeable precast concrete unit pavers) at $253,975, and Alternative #2 (flexible porous pavement) at $238,365. Since no award is indicated, the most concrete “value” we can infer is the base‑scope amount, which reflects the minimum expected contract price if the municipality proceeds with the standard concrete sidewalk option. Therefore the contract’s estimated value is approximately $174,500 (rounded to the nearest hundred). If an alternate paving option is selected, the value would rise to roughly $240,000–$255,000. The estimate accounts for all line‑item quantities, unit prices, and the presence of two higher‑cost alternatives.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Camden County·New Jersey

Top match · 69%

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

City of Dublin·Ohio

68% match

Ballantrae Park – Spray Ground Renovations

Closes 11/2/2026Opened 10/12/2026

City of Delphos·Kansas

68% match

A Place To Play - Park Improvements - Delphos, KS

Closes 11/2/2026Opened 9/28/2026

City of Goose Creek·South Carolina

68% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

Mansfield Housing Authority·Massachusetts

67% match

Courtyard Renovation: Doors, Storms, Painting & Railing Replacement

Closes 11/4/2026Opened 8/26/2026

Washington County, WI·Wisconsin

67% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Pierce County·Washington

67% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

66% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Santa Rosa·California

66% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

City of Danville·Virginia

66% match

IFB-26-27-031-Riverfront Park Guardrail and Fence Improvements

Closes 11/17/2026Opened 10/27/2026

City of Lauderhill·Florida

66% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

City of Englewood·Colorado

66% match

BELLEVIEW PARK ENHANCEMENTS

Closes 11/17/2026Opened 10/15/2026

James City County·Virginia

66% match

Chickahominy Riverfront Park Pool

Closes 11/9/2026Opened 10/9/2026

Miami-Dade County·Florida

66% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

66% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of Lauderhill·Florida

66% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

El Dorado Irrigation District·California

66% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

Town of Cutler Bay·Florida

65% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

Town of Camp Verde·Arizona

65% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Tampa-Hillsborough County Expressway Authority·Florida

65% match

P-0826 Parks Design Services

Closes 11/13/2026Opened 10/2/2026

San Gabriel Unified School District·California

65% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

City of Etowah·Arkansas

65% match

PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL, REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS

Closes 11/10/2026Opened 10/18/2026

City of Billings·Montana

65% match

Evergreen Park Irrigation System Replacement

Closes 11/4/2026Opened 10/8/2026