The contract is for the replacement of the domestic cold and hot water line to the 0408 Lab Research building at the FSU Marine Lab. The respondent will provide all labor, materials, and equipment necessary to complete the replacement. The job time frame is 4 weeks, and the total base bid is $131,427.00. The contract was awarded to WW Gay Mechanical Contractor. Key points to consider for similar contracts include the scope of work, the job time frame, and the total base bid.
• The contract is for a specific construction project at the FSU Marine Lab.
• The respondent must provide all labor, materials, and equipment necessary to complete the replacement.
• The job time frame is 4 weeks.
• The total base bid is $131,427.00.
• The contract was awarded to WW Gay Mechanical Contractor.