Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›CEO-COC Install Sump Pump Drain at ADA Ramp

Awarded contract·County of Orange·California

CEO-COC Install Sump Pump Drain at ADA Ramp

Won by Omega Construction Services, Inc.$300kSingle Award
Contract source

Awarded vendors

  • Omega Construction Services, Inc.

Description

The contract is for the installation of a sump pump drain at an ADA ramp. The work is being performed by Omega Construction Services, Inc. for the County of Orange. The contract duration is one year, starting from April 10, 2025, and ending on April 9, 2026. Key aspects of the contract include the construction and maintenance services provided by the vendor. Some of the categories associated with this contract include building and facility construction and maintenance services, building and facility maintenance and repair services, and specialized trade construction and maintenance services. The contract is worth an estimated amount, which is not explicitly stated in the document. • The contract is for a term-based duration of one year. • The vendor is responsible for providing construction and maintenance services. • The contract is associated with several categories, including building and facility construction and maintenance services. • The point-of-contact person is Joseph Sly, who can be reached at (714) 667-3209 or [email protected].

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
4/10/2025
Ends
4/9/2026
Duration
1 years

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237110
Solicitation №
CT08025010918

Contract value

$300,000

The contract value is not explicitly stated in the document. However, based on the scope of work, which includes the installation of a sump pump drain at an ADA ramp, the estimated value could be around $100,000 to $500,000. This estimate is rough and may vary depending on the actual costs associated with the project, such as labor, materials, and equipment. Factors that may influence the contract value include the complexity of the installation, the materials used, and the location of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia City of Adairsville·Georgia

Top match · 66%

City of Adairsville Water Plant Backwash Pump

Closes 11/17/2026Opened 9/21/2026

City of Pasadena·California

63% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

U.S. Department Of Veterans Affairs·Delaware

63% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

City of Charlotte·North Carolina

63% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

St. Tammany Parish Government·Louisiana

63% match

Ozone Park Subdivision Drainage

Closes 11/4/2026Opened 10/7/2026

City of Norwalk·California

63% match

Well No. 10 GAC Treatment and System Upgrades

Closes 11/10/2026Opened 10/6/2026

City of Cleveland·Ohio

63% match

ADA Pool Lift Procurement and Installation

Closes 12/4/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·California

63% match

Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps

Closes 11/3/2026Opened 10/27/2026

San Bernardino County·California

63% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Coronado·California

63% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

U.S. Department Of Veterans Affairs·Illinois

63% match

J043--Damen Sump Pump Control System Repair

Closes 11/6/2026Opened 10/28/2026

City of Montpelier·Vermont

63% match

Wastewater Collection Suction Lift Pump Systems

Closes 11/26/2026Opened 10/28/2026

City of Seabrook·Texas

62% match

CSB# 2026-17-359 MAIN STREET LIFT STATION DBS (DRI-PRIME BACKUP SYSTEM)

Closes 11/3/2026Opened 10/14/2026

Maryland Baltimore City Department of Public Works·Maryland

62% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Beaumont·California

62% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

DeSoto Parish Police Jury·Louisiana

62% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

Virginia Department of Transportation·Virginia

62% match

B40_2027 ON CALL - ADA COMPLIANCE CURB RAMP IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Metropolitan Council·Minnesota

62% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

West County Wastewater·California

62% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Montpelier·Vermont

62% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

City of South Miami·Florida

62% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

62% match

CTC Drainage Repairs

Rolling / TBD closeOpened 1/20/2026

City of Murfreesboro·Tennessee

62% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

City of Charlotte·North Carolina

62% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

62% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026