Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maine guideMaine Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maine
  4. ›Construction
  5. ›Androscoggin River Bridges Substructure Repairs Mile 78.9

Awarded contract·Maine Turnpike Authority·Maine

Androscoggin River Bridges Substructure Repairs Mile 78.9

$3MSingle Award
Contract source

Description

The contract is for the repair of the Androscoggin River Bridges' substructure and superstructure in the town of Auburn/Lewiston, Maine. The work includes abutment concrete repairs, pier concrete repairs, bearing repairs, joint repairs, post-tensioning sleeve repairs, maintenance of traffic, and all other work incidental thereto. The contract is governed by the Maine Department of Transportation Standard Specifications and the Maine Turnpike Authority's Supplemental Specifications. The contractor is required to follow all applicable laws and regulations, including those related to lead-based paint and stormwater management. The contract also includes provisions for utility coordination, cooperation with other contractors, and the use of best management practices to minimize stormwater pollution. Some key points of the contract include: • The contractor is required to remove and dispose of lead-based paint and paint residue before cutting, grinding, drilling, and sandblasting existing materials. • The contractor must submit a Project-specific Health and Safety Plan and a Hazardous Waste Management Plan before undertaking the removal of lead-based paint. • The contractor is required to use best management practices to minimize stormwater pollution, including the installation of silt fences and the application of hay mulch to soil at the end of each workday. • The contractor must comply with all applicable laws and regulations, including those related to stormwater management and lead-based paint. • The contract includes provisions for utility coordination and cooperation with other contractors. The contract is an important investment in the maintenance and repair of the Androscoggin River Bridges, and it is essential that the contractor follows all applicable laws and regulations to ensure the safety of the public and the environment.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237310
Solicitation №
2018.07

Contract value

$3,000,000

The contract value is not explicitly stated in the documents. However, based on the scope of work and the requirements for the contractor, it is likely that the contract value is in the range of $1 million to $5 million. This is a rough estimate and should be used as a rough order of magnitude (ROM) only. The estimate is based on the following factors: • The scope of work, which includes repairs to the substructure and superstructure of the bridge • The requirements for the contractor, which include the removal and disposal of lead-based paint and the use of best management practices to minimize stormwater pollution • The complexity of the project, which involves working on a bridge over a river It is essential to note that this is a rough estimate and should be used as a rough order of magnitude (ROM) only. The actual contract value may be higher or lower, depending on various factors, including the contractor's bid and the authority's budget.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ormond Beach - Purchasing Office·Florida

Top match · 70%

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

U.S. Department Of Transportation·Washington

69% match

WY NP YELL 15(3), Madison River Bridge Interim Repair

Closes 5/2/2027Opened 5/2/2025

Illinois Tollway·Illinois

69% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Shawnee County·Kansas

68% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

City of Charlotte·North Carolina

68% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

Connecticut Dept. of Transportation·Connecticut

68% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Connecticut Dept. of Transportation·Connecticut

68% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Massachusetts Department of Transportation·Massachusetts

68% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

California Department of Transportation·California

67% match

Construct bridge structure for fish passage restoration.

Closes 12/3/2026Opened 10/12/2026

Connecticut Dept. of Transportation·Connecticut

67% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

California Department of Transportation·California

67% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Lewis County·Washington

67% match

Davison Rd MP 0.01 Bridge Rehabilitation

Closes 11/19/2026Opened 10/29/2026

Connecticut Dept. of Transportation·Connecticut

67% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Texas Department of Transportation·Texas

67% match

STATE LET CONSTRUCTION CONTRACT, BURLESON CO, BRIDGE REPLACEMENT

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Agriculture·California

67% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of San Antonio·Texas

67% match

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

U.S. Department Of Transportation·Washington

66% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

Somerset County·New Jersey

66% match

REHABILITATION OF COUNTY BRIDGE NO. F1306 RIPPLING BROOK WAY OVER TRIBUTARY OF MINE BROOK, BOROUGH OF BERNARDSVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/15/2026

Massachusetts Department of Transportation·Massachusetts

66% match

607349 NORWELL- PEMBROKE- MARSHFIELD- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER

Closes 11/13/2026Opened 1/30/2026

California Department of Transportation·California

66% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

City of Keene·New Hampshire

66% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

City of Vernon·California

66% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Minnesota Department of Administration·Minnesota

66% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Somerset County·New Jersey

66% match

REHABILITATION OF COUNTY BRIDGE NO. F0807 DAVENPORT STREET OVER PETERS BROOK, BOROUGH OF SOMERVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/14/2026