Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Bid 22069 - Factoria Boulevard Storm Conveyance…

Awarded contract·City of Bellevue·Washington

Bid 22069 - Factoria Boulevard Storm Conveyance Improvements Project

Won by Goodfellows Bros., LLC$9.8MSingle Award
Contract source

Awarded vendors

  • Goodfellows Bros., LLC

Description

The Factoria Boulevard Storm Conveyance Improvements Project involves the replacement of existing storm water infrastructure with an increased capacity system along the northbound lanes of Factoria Boulevard Southeast, between SE 36th St and SE 38th St. The project includes various components such as mobilization, traffic control, construction surveying, and water pollution control. The contract was awarded to Goodfellows Bros., LLC, with a total bid amount of $9,808,378.50. The project is expected to improve the storm water conveyance system in the area, reducing the risk of flooding and protecting the environment. Key aspects of the project include: • Replacement of existing storm water infrastructure • Installation of new storm water pipes and structures • Implementation of traffic control measures • Construction surveying and as-built surveying • Water pollution control measures • Erosion control measures • Landscape restoration and mulching • Temporary stream diversion and irrigation • Miscellaneous work, including demolition and removal of existing structures

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
22069

Contract value

$9,808,378

Based on the bid tabulation document, the total bid amount for the project is $9,808,378.50. This amount includes the costs for mobilization, traffic control, construction surveying, and other components of the project. The value of the contract can be estimated to be around $9.8 million, considering the scope of work and the unit prices provided in the bid tabulation document. Factors that may influence the likely contract value include the complexity of the project, the location, and the materials and labor required.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Philadelphia·Pennsylvania

Top match · 77%

PW Bid 2908-CONSTRUCTION of GSI in DEVEREAUX AVE from HAWTHORNE ST

Closes 11/5/2026Opened 10/14/2026

Maryland Baltimore City Department of Public Works·Maryland

76% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

76% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

NYS Brookhaven, Town of·New York

76% match

Bid #26046 - Moriches Island Road Stormwater Mitigation Project

Closes 11/19/2026Opened 10/29/2026

City of South Miami·Florida

76% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Murfreesboro·Tennessee

76% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

City of Lowell·Massachusetts

76% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

City of Fort Wayne·Indiana

76% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

City of Valdosta·Georgia

76% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Coronado·California

76% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Charlotte·North Carolina

76% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of San Clemente·California

76% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

City of Charlotte·North Carolina

75% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

75% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Philadelphia·Pennsylvania

75% match

PW Bid 2918 -Relay of water mains and construction of GSI in 26th St from W. Clearfield St.

Closes 11/5/2026Opened 10/14/2026

Ohio City of Westerville·Ohio

75% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

75% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

Georgia City of Peachtree City·Georgia

75% match

Tuxedo Lane Drainage Improvement Project (10/19 amended)

Closes 11/17/2026Opened 10/15/2026

City of Charlotte·North Carolina

75% match

Collective AD Storm Drainage Improvement Program

Rolling / TBD closeOpened 3/15/2026

City of Pasadena·California

75% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

75% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

DeSoto Parish Police Jury·Louisiana

75% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

County of Santa Cruz·California

75% match

Upper East Zayante PM 1.18 Storm Damage Repair Project

Closes 11/12/2026Opened 10/15/2026

City of Smithville·Missouri

75% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

City of Charlotte·North Carolina

75% match

Foxrun/Burtonwood Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/29/2028