The Factoria Boulevard Storm Conveyance Improvements Project involves the replacement of existing storm water infrastructure with an increased capacity system along the northbound lanes of Factoria Boulevard Southeast, between SE 36th St and SE 38th St. The project includes various components such as mobilization, traffic control, construction surveying, and water pollution control. The contract was awarded to Goodfellows Bros., LLC, with a total bid amount of $9,808,378.50. The project is expected to improve the storm water conveyance system in the area, reducing the risk of flooding and protecting the environment. Key aspects of the project include:
• Replacement of existing storm water infrastructure
• Installation of new storm water pipes and structures
• Implementation of traffic control measures
• Construction surveying and as-built surveying
• Water pollution control measures
• Erosion control measures
• Landscape restoration and mulching
• Temporary stream diversion and irrigation
• Miscellaneous work, including demolition and removal of existing structures