The contract is for the construction of the Monks Well Waterline, which includes the installation of approximately 2,400 LF of 12-inch ductile iron watermain with appurtenances, parallel APS electrical conduits, and an AB gravel access road. The project is located in Prescott Valley, Arizona, and the contract was awarded through a request for bids. The bid documents, plans, and specifications can be obtained from the website at www.publicpurchase.com. The contract has a base bid schedule with various items, including the installation of pipe materials, construction of access roads, and erosion control devices. The contract also includes a tabulation of bids received, with the winning bid amounting to $349,958.00.