This contract is for the AML Project 17.6B-Tetra Tech Krezelok Mine Drilling and Grouting. The project involves mine subsidence mitigation, drilling, and grouting. The contract was awarded to Single Water Services, LLC for a total bid of $2,542,016.25. The contract requires the contractor to perform drilling and grouting services to mitigate mine subsidence. The project is located in Wyoming, and the contractor must comply with all applicable laws and regulations.
• The contract requires the contractor to submit a 10% bid bond or a 10% cashier check with their bid.
• The contractor must also submit a pre-qualification packet and attend a mandatory online bid tour meeting.
• The contract has a total of six addenda, which must be accepted by the contractor.
• The contractor must perform the work in accordance with the specifications and plans provided.
• The contract has a total bid value of $2,542,016.25, with a 5% increase for a total of $2,669,235.00.