The Chelan Public Utility District awarded a contract to replace the motor control center (MCC) at the Carlton Pond facility. The scope includes supplying a new cabinet, two variable‑frequency‑drive motor controls, a lighting panel, power monitor, transformer, transformer disconnect, and all related equipment and materials, followed by installation and commissioning of a complete, functioning MCC as shown on contract drawings. The work must be delivered and installed between late May and late September 2024, with a total contract value of approximately $347 K.
• Full replacement of MCC with new cabinet and associated controls and power equipment.
• Installation, testing, and commissioning at 203 Olds Station Road, Wenatchee, WA.
• Awarded to Midland Electric, Inc. after an open competition with at least one other bidder.
• Contract falls under labor‑and‑materials solicitation, indicating a time‑and‑materials pricing approach.