The contract is for the construction of the RD 537 Pump Station, including the furnishing of all labor, materials, equipment, and supervision. The project involves the construction of a pump station structure, pipe vaults, concrete stairway, trash rack, piping, valves, gates, electrical, motor control center, generator, pump, electric motor, MCC Security Structure, Generator Security Structure, structure excavation, structure backfill, dewatering, aggregate base, and other work as necessary to complete the pump station. The contract has a total bid of $7,749,400.00 and was awarded to GSE Construction Company Inc.
Some key features of this contract include:
• The contract is for a construction project
• The project involves the construction of a pump station
• The contract has a total bid of $7,749,400.00
• The contract was awarded to GSE Construction Company Inc.
• The project is located in California
• The contract is managed by the County of Sacramento