The City of Hesperia is seeking a Design-Build Entity to provide collaborative-delivery services for the design and construction of a new 4.0 MGD Wastewater Treatment Plant and related facilities. The project includes the construction of diversion manholes or junction structures, sewer pipes, lift station, and force mains required to redirect current sewer flows to the new wastewater treatment plant. The treated water from the plant shall be discharged to percolation ponds and/or recycled water storage tanks. The scope of work also includes the construction of a recycled water pump station and on-site recycled water piping. The project is estimated to cost between $40 million and $45 million.
• The project includes the design and construction of a new 4.0 MGD Wastewater Treatment Plant
• The project includes the construction of diversion manholes or junction structures, sewer pipes, lift station, and force mains
• The treated water from the plant shall be discharged to percolation ponds and/or recycled water storage tanks
• The scope of work also includes the construction of a recycled water pump station and on-site recycled water piping
• The project is estimated to cost between $40 million and $45 million