Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Civil Engineering
  5. ›Cedar Street Improvements

Awarded contract·City of Olathe·Kansas

Cedar Street Improvements

Won by Walter P. Moore and Associates, Inc.$350kSingle Award
Contract source

Awarded vendors

  • Walter P. Moore and Associates, Inc.

Description

The City of Olathe, Kansas, Public Works Department requested qualified design firms to submit qualifications for the preparation of design documents for the Cedar Street Improvements project. The project involves the full depth reconstruction of Cedar Street, including sidewalks, stormwater improvements, utility relocations, and street lights. The selected vendor, Walter P. Moore and Associates, Inc., will provide design services, including survey of existing conditions, utility coordination, public involvement, and development of construction plans. • The project is funded by the City of Olathe Street Reconstruction Program. • The project includes the reconstruction of Cedar Street from S. Kansas Avenue to S. Blake Street. • The design services will include survey of existing conditions, utility coordination, public involvement, and development of construction plans. • The project requires the relocation of utilities, water, and sewer lines, as well as the installation of street lights. • The vendor will also provide assistance with bidding and construction of the project.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Civil Engineering
NAICS
541330
Solicitation №
3-R-002-15

Contract value

$350,000

The contract value is not explicitly stated in the document. However, based on the project description, it is likely that the contract value is in the range of hundreds of thousands to millions of dollars, considering the scope of the project, which includes the reconstruction of a street, utility relocations, and installation of street lights. The cost of design services, which is the primary scope of this contract, is typically a fraction of the total project cost. Assuming the total project cost is around $5 million to $10 million, the design services cost would be around $200,000 to $500,000, which is a rough estimate based on industry standards.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Cedar Rapids·Iowa

Top match · 72%

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

North Carolina Town of Knightdale·North Carolina

65% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Charleston County·South Carolina

65% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Charlotte·North Carolina

65% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Nevada Government·Nevada

64% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Georgia City of College Park·Georgia

64% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

64% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

City of Indianapolis·Indiana

64% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Charlotte·North Carolina

64% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

LA Public Works Engineering Bureau·California

64% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Charlotte·North Carolina

63% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Shawnee·Kansas

63% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

City of Charlotte·North Carolina

63% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Hesperia·California

63% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

City of Riverside·California

63% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Coronado·California

63% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

NYS East Fishkill, Town of·New York

63% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026