The City of Olathe is seeking bids for the replacement of the Harrison Street Water Main. The project involves the replacement of 2,792 feet of existing 16-inch DIP water main with a new 16-inch HDPE DR11 pipe and fittings, as well as the replacement of existing connections of 216 feet of 8-inch and 157 feet of 12-inch DIP water main with 8-inch and 12-inch HDPE DR11 pipe and fittings. The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds.
• The bid documents, including drawings and specifications, are available for download from www.publicpurchase.com.
• A satisfactory bid bond executed by the bidder or an acceptable surety, in an amount equal to five percent (5%) of the total bid for work, must be submitted with each proposal.
• The City of Olathe reserves the right to reject any or all bids or to waive any informality in the bidding.
• The contract is expected to be awarded for a period of time, but the exact duration is not specified.