Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Environmental Services
  5. ›Rest Area Septic Tank Pumping Billings Eastside

Awarded contract·Montana Department of Transportation (MDT)·Montana

Rest Area Septic Tank Pumping Billings Eastside

$187kSingle Award
Contract source

Description

The Montana Department of Transportation (MDT) is seeking bids for the Rest Area Septic Tank Pumping Billings Eastside project. The contract involves pumping out septic tank sites at three rest areas (Custer, Hardin, and Hysham) on an "as needed" basis. The contractor will be responsible for providing all labor, equipment, materials, and incidentals necessary to complete the work. The contract period is from December 1, 2025, to November 30, 2026. • The contract requires the contractor to clean and flush all chambers, properly dispose of all septic waste material, and restore the site to its original grade and appearance. • The contractor must also secure all permits and dumping fees required. • The MDT will be responsible for uncovering the septic tank chamber opening and providing the contractor with the locations of the tank openings at each site. • The contractor must complete the work within three working days of notification and must enforce all relevant federal, state, and local safety and health requirements.

Attached files

Key dates

Starts
12/1/2025
Ends
11/30/2026
Duration
1 years

Last updated

Details

Award type
Single Award
Industry
Environmental Services
NAICS
562991
Solicitation №
MDT-316271-RP

Contract value

$186,700

The value of the contract can be estimated based on the cost per pumping trip for each rest area. The total cost will depend on the frequency of pumping needed, which is not specified in the contract document. However, assuming an average of 4-6 pumping trips per year for each rest area, the total cost can be estimated as follows: - Custer Rest Area (2 sites): 2 x $4,500 x 4-6 trips/year = $36,000 - $54,000 per year - Hardin Rest Area (2 sites): 2 x $6,570 x 4-6 trips/year = $52,560 - $78,840 per year - Hysham Rest Area (1 site): 1 x $15,000 x 4-6 trips/year = $60,000 - $90,000 per year Total estimated annual cost: $148,560 - $223,840 Since the contract period is 1 year, the total contract value can be estimated as $148,560 - $223,840.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Department of Water Resources·California

Top match · 67%

IFB 10222573 - Portable Toilet Rentals and Septic Holding Tank Pumping Services

Closes 11/12/2026Opened 10/9/2026

Michigan Department of Transportation·Michigan

66% match

Septic Tank & Vault Pumping Services - MDOT Grand Region

Closes 11/12/2026Opened 10/28/2026

Michigan Department of Transportation – Contract Services Division – Purchasing·Michigan

66% match

Septic Tank & Vault Pumping Services - MDOT Grand Region

Closes 11/12/2026Opened 10/23/2026

City of Phoenix·Arizona

66% match

Septic Tank Pumping Services

Closes 11/10/2026Opened 10/19/2026

Dept of Natural Resources·Wisconsin

63% match

Septic Pit Pumping Services

Closes 11/2/2026Opened 10/9/2026

U.S. Department Of Agriculture·Minnesota

63% match

Septic Toilet Pumping for Chippewa National Forest

Closes 11/4/2026Opened 10/20/2026

U.P. Engineers & Architects, Inc·Michigan

62% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Wi Dept of Transportation·Wisconsin

62% match

Septic Pit Pumping Services

Closes 11/2/2026Opened 10/9/2026

California Department of Water Resources·California

62% match

IFB 10222572 - Portable Toilet Rentals and Septic Holding Tank Pumping Services

Closes 11/12/2026Opened 10/9/2026

City of Billings·Montana

61% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/1/2026

U.S. Department Of Defense·California

60% match

Coyote Valley Dam (CVD) Lake Mendocino Sewage and Septic Services

Closes 11/9/2026Opened 10/28/2026

U.S. Department Of Agriculture·Oregon

60% match

Toilet Pumping for Powers & Gold Beach Ranger District

Closes 11/9/2026Opened 10/22/2026

Massachusetts Town of Hopkinton·Massachusetts

60% match

GROVE STREET TANK REHABILIATION

Closes 11/18/2026Opened 10/28/2026

City of Billings·Montana

60% match

Evergreen Park Irrigation System Replacement

Closes 11/4/2026Opened 10/8/2026

Upper Occoquan Service Authority·Virginia

60% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Billings·Montana

60% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/2/2026

Town of Babylon·New York

59% match

BID# 26G53 - CONSTRUCTION OF AUXILIARY PUMP & PUMP STATION AT CELL 7

Closes 11/5/2026Opened 10/21/2026

Riverside Transit Agency·California

59% match

Deionized Water Services

Closes 11/19/2026Opened 10/29/2026

Gwinnett County Government·Georgia

59% match

Bypass Pumping Services on an Annual Contract

Closes 11/6/2026Opened 9/30/2026

New York City Department of Environmental Protection·New York

59% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

Michigan Department of Health, Bureau of Engineering·Michigan

59% match

761/26157.JBB; Wells SP-Beach House Septic Sys Upgrades

Closes 11/12/2026Opened 10/22/2026

Los Angeles County·California

59% match

DBH85 - AS-NEEDED SEPTIC TANK MAINTENANCE SERVICES - RFSQ - Closing: Continuous

Closes 11/21/2026Opened 11/21/2024

City of Tulsa·Oklahoma

58% match

6in Sewage Pump

Closes 11/18/2026Opened 10/21/2026

Gwinnett County Government·Georgia

58% match

Bypass Pumping Services on an Annual Contract

Closes 11/6/2026Opened 9/30/2026

U.S. Department Of Veterans Affairs·Washington

58% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026