The contract involves the drilling of a test hole and the construction of a 10-inch-diameter extraction well at the Kiefer Landfill. The work includes equipping the well with a submersible pump and motor, concrete pad, aboveground piping and valves, buried pipeline, and connection to the existing buried pipeline. The contract also involves rehabilitating five existing extraction wells. The apparent low bid was $540,169 by Cascade Drilling, LP. Key aspects of the contract include:
• Drilling a test hole to an approximate depth of 235 feet
• Constructing and developing a 10-inch-diameter extraction well to a depth of about 230 feet
• Equipping the extraction well with a 25 HP submersible pump and motor
• Rehabilitating five existing extraction wells
• Providing and installing all electrical, control, structural, and pump discharge equipment to connect to an existing pipeline