This emergency procurement contract authorizes Chandler Construction Services, Inc. to repair a critical underground hot‑water pipe leak on the Greenwood Campus of Piedmont Technical College. The leak caused loss of heat to two campus buildings during sub‑freezing temperatures, prompting immediate action. The scope includes leak detection, concrete demolition, hand‑digging, replacement and welding of 36 ft of supply and 36 ft of return pipe, insulation of the repaired sections, and restoration of the sidewalk concrete. The total contract value is $51,237, covering all labor, materials, and equipment needed for the complete repair.
• Immediate emergency response to restore heating to K‑Building (Library) and H‑Building (offices/classrooms).
• Comprehensive work package: detection, demolition, pipe replacement, welding, insulation, and concrete restoration.
• Sole‑source award to a local contractor with a 7‑man crew ready to mobilize within a day.