This contract awards two separate sub‑aqueous water‑main crossing projects to improve the Hampton Bays Water District’s distribution system. Contract A (Bancker Construction Corp.) covers the Shinnecock Canal at Meschutt Beach; Contract B (G&M Earth Moving, Inc.) covers the Ponquogue Bridge at Lighthouse Road. Both contracts are capped at $1.288 M and $2.854 M respectively, with a total ceiling of $4.142 M, and must be completed by the end of 2022, with optional one‑year extensions. The work includes excavation, directional drilling, installation of ductile‑iron and HDPE water mains, valve and hydrant installation, road repaving, and associated civil‑engineering tasks, all overseen by H2M Architects and Engineers.
• Awarded via full open competition; two firms received separate contracts.
• Funding sourced from the Town’s General Ledger (GL CW‑99‑H529‑00‑6213‑0000) under capital project HBWD 21.3.
• Contracts are firm‑fixed‑price with a “not‑to‑exceed” ceiling and include a renewal option for up to two additional one‑year terms.