The contract is for the construction of the Storm Pipe Replacement - 8th/Jackson project, which includes the removal of existing storm manholes, basins, and piping, and the construction of new storm pipe, manholes, curb inlets, and catch basins. The project also includes PCC street panel reconstruction, HMAC paving, sidewalk, and ADA improvements. The engineering estimate for the project is $650,000. The contract is a public works contract subject to ORS 279C.800 to 279C.870. The City of Corvallis encourages small, minority, and women-owned businesses to bid.
• The project consists of removal of existing storm manholes, basins, and piping
• Construction of 12-inch, 10-inch, and 6-inch PVC storm pipe, manholes, curb inlets, and catch basins
• PCC street panel reconstruction, HMAC paving, sidewalk, and ADA improvements
• The engineering estimate for the project is $650,000
• The contract is a public works contract subject to ORS 279C.800 to 279C.870