Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Recycled Water Connection Pipeline Construction

Awarded contract·Pleasant Valley County Water District·California

Recycled Water Connection Pipeline Construction

Won by J Vega Engineering +3 more$4MMultiple Award
Contract source

Awarded vendors

  • J Vega Engineering
  • Travis Agricultural Const
  • Blois Construction Inc.
  • Sam Hill & Sons, Inc.

Description

The contract involves the installation of approximately 7,500 linear feet of 18" recycled water pipeline along the northern edge of Laguna Road between Wood Road and Las Posas Road. The project includes open trench installation and horizontal directional drilling installation. The contract was awarded to multiple bidders, with the base bid items and optional bid items listed. The contract value is estimated based on the bids provided, with a total value ranging from $3,633,777 to $4,575,711. The scope of work includes mobilization, demobilization, and cleanup, traffic control, BMP implementation, erosion control, and SWPPP, among other items. • The contract involves the installation of 18" diameter AWWA C-900 DR 18 PVC recycled water pipe. • The contract includes the construction of 18" diameter AWWA C-900 restrained joints DR 18 PVC recycled water pipe. • The contract involves the installation of 2" CAV facility and 4" blow off facility. • The contract includes tie-in connections to existing PCCP pipe at specified locations. • The contract involves the removal and replacement of catch basin's concrete apron and asphalt concrete pavement.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
PVCWD 2023-01

Contract value

$4,000,000

The contract value is estimated based on the bids provided, with a total value ranging from $3,633,777 to $4,575,711. The bids include the base bid items and optional bid items, with unit prices and line totals provided for each item. The estimated value is based on the sum of the line totals for each bidder. Factors that may influence the likely contract value include the scope of work, the number of bidders, and the unit prices provided.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Redlands·California

Top match · 72%

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Columbus Ohio·Ohio

69% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

El Paso Water·Texas

69% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

U.S. Department Of The Interior·California

68% match

FWS - Pixley NWR Water Recirculation Design-Build

Closes 11/30/2026Opened 10/30/2026

Tarrant Regional Water District·Texas

68% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

El Paso Water·Texas

68% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

El Paso Water·Texas

68% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026

El Paso Water·Texas

68% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

The City of Columbus·Ohio

67% match

RFQ033812 - PAWP Wellfield Development

Closes 11/4/2026Opened 10/7/2026

City of Fresno·California

66% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

California Grants·California

66% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

California Grants·California

66% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

City of Marysville, Ohio·Ohio

66% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Austin·Texas

66% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

City of Conway·South Carolina

66% match

HWY 905 Water Line Upgrade - RFP

Closes 12/3/2026Opened 10/30/2026

City of Austin·Texas

66% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

Town of Jupiter·Florida

66% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/3/2026Opened 10/6/2026

Eastern Municipal Water District·California

66% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Edgewater, FL·Florida

66% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Catawba Regional Council of Governments·South Carolina

65% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of El Paso De Robles·California

65% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

Eastern Municipal Water District·California

65% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

County of Hawaii·Hawaii

65% match

Kealakehe Wastewater Treatment Plant R-1 Upgrades

Closes 11/2/2026Opened 10/2/2026

Inland Empire Utilities Agency·California

65% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026