This contract is a public‑works storm‑water‑management (SWM) culvert replacement project in Snohomish County, Washington. The scope includes full site preparation, excavation, grading, stream‑bed improvements, installation of ductile‑iron sewer pipe and related structures, road resurfacing with hot‑mix asphalt, erosion control, and comprehensive traffic‑control measures. The award was made to Reece Construction at a lump‑sum price of $1,844,058, representing a roughly 22 % discount below the engineer’s estimate of $2.58 M. The solicitation required compliance with MWBE participation goals, a 5 % bid bond, and various statutory certifications (non‑collusion, wage‑payment, debarment). The project is divided into two geographic groups (near 9116 Grandview Ave and near Cedarvale Loop Rd).
• Scope: 61 line‑items covering mobilization, grading, drainage, pipe installation, surfacing, erosion control, traffic safety, surveying, and assorted contract‑administration items.
• Award: Single‑award to Reece Construction (lowest bid).
• Key Requirements: 5 % bid guarantee, MWBE certifications, performance bond, start‑work within 21 days of contract execution.