This contract awards a spot‑improvement storm‑water upgrade for the City of Yakima. The work encompasses traffic control, excavation, utility protection, installation of PVC storm‑sewer pipelines, concrete and hot‑mix asphalt pavement, curbs, gutters, sidewalks, and related concrete structures such as manholes, valve boxes, and catch basins. The award was made to Ascent Foundation and More, LLC for a lump‑sum total of roughly $250 k.
• Scope: pipe replacement (12‑in. & 8‑in. PVC), concrete curbs/gutters, sidewalks, HMA pavement, and associated site work.
• Competitive open bid: bids opened 9 / 12 / 2025; award recommendation signed 9 / 15 / 2025.
• Vendor: Ascent Foundation and More, LLC (Cle Elum, WA) – single‑award, firm‑fixed‑price.