The City of Bellevue is seeking a contractor to replace approximately 13,100 LF of ductile iron water mains, construct approximately 140 LF of 10-inch or 12-inch HDPE water main by horizontal directional drilling (HDD), install new fire hydrant assemblies, water services, and a 6-inch pressure reducing valve station. The contract also includes relocating existing utilities, restoring surface conditions, and performing other work as required to complete the project. The engineer's estimate for the project is $4,434,554.30.
• The project includes the replacement of water mains and the installation of new fire hydrant assemblies and water services.
• The contract requires the contractor to relocate existing utilities and restore surface conditions.
• The project is estimated to cost $4,434,554.30.
• The contract was awarded to D & G Backhoe Inc, with a total bid price of $3,576,086.43.