The City of Richland is seeking bids for the Center Parkway Extension North project, which includes the construction of a new 3-lane roadway with sidewalks, curb and gutter, bike lanes, storm drainage, street lights, and a signalized at-grade railroad crossing. The project is estimated to cost between $1,450,000 and $1,850,000. The bid tabulation document lists several vendors and their corresponding bid amounts. The contract was awarded to one or more of these vendors, but the specific award details are not provided in the text.
• The project includes construction of a new 3-lane roadway with various features.
• The project is estimated to cost between $1,450,000 and $1,850,000.
• The bid tabulation document lists several vendors and their corresponding bid amounts.
• The contract was awarded to one or more of these vendors, but the specific award details are not provided in the text.