The City of Bellevue, Washington, is seeking bids for the 120th Avenue NE Corridor Project Stage 3. The project involves the construction of a corridor between NE 12th and NE 16th streets, and includes the removal of asphalt, sidewalks, and structures, as well as the installation of new roadway excavation, embankment, and preload. The project also includes the construction of a pre-cast cement concrete girder bridge, soldier pile and gravity block walls, storm drainage improvements, and water and sewer systems replacement. The successful bidder will be required to comply with the City of Bellevue's equal opportunity requirements and to meet the required contract provisions for both the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA).
• The project is funded by both the FHWA and the FTA, and is subject to the Buy America Requirements.
• The project includes the construction of a pre-cast cement concrete girder bridge and soldier pile and gravity block walls.
• The project requires the removal of contaminated soils and water.
• The project includes the installation of new landscaping and irrigation systems.
• The project requires the coordination with Puget Sound Energy for a franchise utility constructed joint utility trench.
• The project includes the installation of traffic signals and illumination.