Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›120TH AVE NE CORRIDOR PROJECT STAGE 3 NI 12TH ST TO NE…

Awarded contract·City of Bellevue·Washington

120TH AVE NE CORRIDOR PROJECT STAGE 3 NI 12TH ST TO NE 16TH ST

Won by Johansen Excavating Inc +6 more$13.0MMultiple Award
Contract source

Awarded vendors

  • Johansen Excavating Inc
  • Gary Merlino Construction Co Inc
  • Scarsella Bros Inc
  • Interwest Construction Inc
  • CECCANTI
  • KLB Construction
  • IMCO General Construction

Description

The City of Bellevue, Washington, is seeking bids for the 120th Avenue NE Corridor Project Stage 3. The project involves the construction of a corridor between NE 12th and NE 16th streets, and includes the removal of asphalt, sidewalks, and structures, as well as the installation of new roadway excavation, embankment, and preload. The project also includes the construction of a pre-cast cement concrete girder bridge, soldier pile and gravity block walls, storm drainage improvements, and water and sewer systems replacement. The successful bidder will be required to comply with the City of Bellevue's equal opportunity requirements and to meet the required contract provisions for both the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). • The project is funded by both the FHWA and the FTA, and is subject to the Buy America Requirements. • The project includes the construction of a pre-cast cement concrete girder bridge and soldier pile and gravity block walls. • The project requires the removal of contaminated soils and water. • The project includes the installation of new landscaping and irrigation systems. • The project requires the coordination with Puget Sound Energy for a franchise utility constructed joint utility trench. • The project includes the installation of traffic signals and illumination.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
16033

Contract value

$13,005,000

The engineer's estimate for the project is $13,005,000.00. Based on this estimate, the contract value is likely to be around $13 million. However, the actual contract value may vary depending on the bids received and the final contract award.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 63%

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

City of The Colony·Texas

63% match

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

City of Charlotte·North Carolina

63% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

State of Delaware DOT·Delaware

62% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

City of Charlotte·North Carolina

62% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Idaho Transportation Department·Idaho

61% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Missouri Department of Transportation·Missouri

61% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Keene·New Hampshire

61% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Moore & Bruggink, Inc·Michigan

61% match

250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path

Closes 11/12/2026Opened 10/27/2026

Minnesota Department of Transportation·Minnesota

61% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

County of Loudoun·Virginia

61% match

IFB NG00004: Route 15 North Widening: Battlefield Parkway to Montresor Road

Closes 11/20/2026Opened 10/13/2026

City of Charlotte·North Carolina

61% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Harrisonburg·Virginia

61% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Missouri Department of Transportation·Missouri

61% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Houston-Galveston Area Council·Texas

61% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

City of Charlotte·North Carolina

60% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

Texas Houston-Galveston Area Council·Texas

60% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

City of Charlotte·North Carolina

60% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Austin·Texas

60% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Municipality of Anchorage·Alaska

60% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

U.S. DOT - Federal Railroad Administration·United States of America

60% match

FY27 Northeast Corridor Cooperative Agreement to the National Railroad Passenger Corporation

Closes 11/27/2026Opened 10/28/2026

City of Cincinnati·Ohio

60% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Austin·Texas

59% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

Illinois Natural Resources·Illinois

59% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026