The Antelope Canal Automation project involves the modification of two raw water transport canals, including improvements to physical and electronic control systems. The work consists of grading, excavation, cast-in-place concrete, shotcrete, metal work, grating, fencing, metering equipment installation, communication equipment installation, and electrical work. The project is estimated to cost around $435,000. The bid was opened on December 15, 2020, and the lowest bid was $436,000 from BWD Construction, Inc.
• The project requires a mandatory pre-bid walk-through meeting.
• The bid documents, including plans and specifications, are available for download.
• The project has a fixed price estimate of $435,000.
• The bid was open to various contractors, with the lowest bid being $436,000.