Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Module 5/Module 13 Separation Liner System Construction

Awarded contract·Western Placer Waste Management Authority (WPWMA)·California

Module 5/Module 13 Separation Liner System Construction

Won by Innovative Construction Solutions +1 more$1.6MMultiple Award
Contract source

Awarded vendors

  • Innovative Construction Solutions
  • Boston Pacific Inc

Description

The contract is for the construction of a separation liner system between Modules 5 and 13. The project involves removing and replacing soil, installing a geosynthetic separation liner system, and placing a 60-mil high-density polyethylene liner. The contract also includes the installation of subsurface piping, backfilling trenches, and placing a stormwater diversion berm. The estimated cost of the project is $1,630,000. The contract was awarded through a competitive bidding process, and the successful bidder must possess a valid Class A General Engineering Contractor License issued by the State of California. • The project involves the construction of a separation liner system • The estimated cost of the project is $1,630,000 • The contract was awarded through a competitive bidding process • The successful bidder must possess a valid Class A General Engineering Contractor License

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
100212

Contract value

$1,630,000

The estimated value of the contract is $1,630,000, as stated in the contract documents. This value is based on the scope of work, which includes the construction of a separation liner system, installation of subsurface piping, and placement of a stormwater diversion berm. The value takes into account the materials, labor, and equipment required for the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

San Bernardino County·California

Top match · 65%

Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill

Closes 11/12/2026Opened 10/27/2026

County of Sacramento·California

64% match

Kiefer Landfill- Module 5, Phase 1 Liner Construction

Closes 11/5/2026Opened 8/31/2026

U.S. Department Of Defense·United States of America

63% match

MOISTURE SEPARATOR

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Pennsylvania

62% match

DISCHARGE MODULE

Closes 11/9/2026Opened 6/10/2026

U.S. Department Of Defense·United States of America

62% match

MODULE ASSEMBLY,RIM

Closes 2/12/2027Opened 10/29/2026

U.S. Department Of Defense·Pennsylvania

61% match

COOLANT SEPARATION SYSTEM

Closes 11/5/2026Opened 10/21/2026

Texas Houston-Galveston Area Council·Texas

61% match

Freight Grade Separation Planning Studies Program Services

Closes 12/10/2026Opened 10/21/2026

Houston-Galveston Area Council·Texas

61% match

Freight Grade Separation Planning Studies Program Services

Closes 12/10/2026Opened 10/21/2026

U.S. Department Of Defense·Florida

61% match

Mission Module Engineering and Technical Services

Closes 12/3/2026Opened 10/28/2026

City of San Bernardino·California

61% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

61% match

MODULE ASSEMBLY,RIM

Closes 1/29/2027Opened 9/1/2026

City of Fond du Lac·Wisconsin

61% match

MIXED LIQUOR SPLITTER STRUCTURE IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·Washington

60% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 6/15/2026

U.S. Department Of Defense·Washington

60% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

60% match

66--SYSTEM ASSEMBLY,SUB

Closes 11/16/2026Opened 10/20/2026

California Department of Forestry and Fire Protection·California

60% match

Diesel Exhaust Removal System Installation Services

Closes 11/2/2026Opened 9/30/2026

California Department of General Services·California

60% match

Project11679.FleetOPSReroof.Contract25-338697

Closes 11/18/2026Opened 10/16/2026

Ohio Department of Transportation·Ohio

60% match

D08-RFQ-2143 Tunnel Liner

Closes 11/10/2026Opened 10/27/2026

West Basin Municipal Water·California

60% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

U.S. Department Of Defense·California

60% match

NAVAL POSTGRADUATE SCHOOL MODERNIZATION PROGRAM CONTRACTOR LIST

Closes 12/31/2030Opened 12/31/2024

U.S. Department Of Defense·Alabama

60% match

Noun: LINER AND BEARING A NSN:2840009860444 P/N:2-080-120-01

Closes 12/14/2026Opened 10/28/2026

U.S. Department Of Defense·Florida

60% match

IEP MODULE

Closes 11/9/2026Opened 10/9/2026

West Basin Municipal Water District·California

60% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

U.S. Department Of Defense·Hawaii

59% match

SEALING RING SPLIT (#2)

Closes 11/2/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

59% match

DISCHARGE MODULE

Closes 11/9/2026Opened 9/9/2026