This contract concerns the complete reconstruction of the parking lot at 400 Mack Avenue on the Wayne State University campus. The work includes demolition of existing hot‑mix asphalt, removal of unsuitable base, installation of new sub‑base and base layers (including a 10‑in. sand sub‑base as an alternate), placement of 21 AA limestone aggregate, new concrete pavement (4,000 psi), concrete curbs, sidewalks, bollards, a 6‑in. HDPE under‑drain, relocation of existing light poles, and conduit installation for future automated gate controls. The project requires compliance with WSU wage rates, certified payroll, insurance, bonds, and a smoke‑free policy, and must be completed by 15 December 2025 with liquidated damages of $500 per day for delays.
• Mandatory pre‑bid conference (9 a.m., 7 Sept 2025) and optional site visit (17 July 2025).
• Bids due 5 Aug 2025, 2:00 p.m.; award made to Asphalt Specialists.
• Contractor must provide its own dumpster, obtain City of Detroit right‑of‑way permits, and adhere to stringent environmental and safety standards.