This contract awards the design‑build of a new roundabout at the intersection of S. 72nd Avenue and W. Washington Avenue in Yakima, Washington. The scope covers full civil construction—including earthwork, paving, concrete curbs and gutters, storm‑drain and under‑drain pipe installation, sidewalks, bike ramp, lighting, signage, erosion control, and limited landscaping—delivered as a lump‑sum construction contract. The City of Yakima opened competitive sealed bids on 10 April 2025, the engineer’s report was signed on 16 April 2025, and the City Manager formally awarded the contract on 17 April 2025 to Culbert Construction, Inc. The winning bid is approximately $1.48 million, reflecting a comprehensive infrastructure upgrade that will improve traffic flow, safety, and pedestrian access at the site.
• Full civil roundabout construction (earthwork, pavement, concrete islands)
• Storm‑water infrastructure (12‑in. & 15‑in. pipes, catch basins, under‑drains)
• Ancillary works: sidewalks, bike ramp, lighting, signage, erosion control, landscaping
• Lump‑sum contract awarded to a single Washington‑based general contractor
• Bid opening 4/10/2025, award 4/17/2025, total award value ≈ $1.48 M