The contract is for the modernization of one elevator at The Summer House, located at 321 Ridgewood Ave., Paramus, NJ. The project includes engineering, ordering, equipment manufacturing, and site work, with a total duration of 35 weeks. The base bid is $277,000, with a $25,000 allowance, making the total bid $302,000. The contract was awarded to Current Elevator Technology. Key aspects of the contract include:
• The project timeline, with specific deadlines for engineering, ordering, equipment manufacturing, and site work
• The base bid and allowance, which make up the total bid
• The contractor's obligations, including furnishing all labor, materials, tools, equipment, and insurance required by the contract documents
• The requirement for the contractor to pay all applicable taxes and to furnish all things as provided in the contract documents