This public‑works contract calls for the removal of the existing Weishaupt Burner #3 at Spokane’s Riverside Park Water Reclamation Facility and the installation of a new burner with a modern boiler‑control system that interfaces to the plant’s SCADA network. The scope includes stainless‑steel gas‑line replacements (natural‑gas and digester‑gas), control‑system upgrades, safety‑valve installation, a mandatory 30‑minute on‑site safety orientation, and full documentation of all work. The bid is a competitive, open‑competition solicitation with a required 5 % bid bond, a 60‑day non‑withdrawal period, and a substantial‑completion deadline of 12/31/2026 with $500 per day liquidated‑damage penalties.
• Scope: burner replacement, gas‑line upgrade, electronic control integration, SCADA data‑point provisioning.
• Budget: Engineer’s estimate $500,000; submitted bids range $369,900–$520,000.
• Eligibility: Washington‑licensed contractors, required registrations (UBI, excise tax, business license), apprenticeship and prevailing‑wage compliance, and a one‑hour post‑bid subcontractor disclosure.