The Four Canyons Parkway Phase 2B project is a large‑scale civil construction effort in Grand Junction, CO, encompassing water‑distribution, sewer and storm‑drain upgrades, roadway reconstruction, concrete structures, traffic‑signal installation, utility conduit work, and associated landscaping. The solicitation listed four qualified bidders with total bid amounts ranging from roughly $18.5 M to $21 M, and the city indicated that all bids would be verified for compliance prior to a final award. The scope includes installation of various pipe sizes, valves, hydrants, manholes, concrete pipe, back‑fill, stabilization material, asphalt paving, curb and gutter, retaining walls, signal poles, cabinets, detection systems, and extensive site work such as grading, excavation, and temporary facilities.