Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Z--BRCA 310427 Southbound Shuttle Stop

U.S. Department Of The Interior·Utah

Z--BRCA 310427 Southbound Shuttle Stop

Closes in 2 days$800k – $2.5MRequest for Proposal
Get bids like this by emailBid source

Description

The National Park Service is seeking a small‑business contractor to design and construct a new southbound shuttle‑bus stop, associated curb, sidewalk, retaining wall, signage, and pedestrian crosswalk at Bryce Canyon National Park. The work includes site preparation, utility relocation, new storm‑drain culverts, asphalt and concrete paving, ADA‑compliant ramp, shelter, and full traffic‑control planning while protecting sensitive wildlife habitat. The contract is a firm‑fixed‑price, lump‑sum award with a performance period of approximately five months. • Construct shuttle‑lane, curb, retaining wall, ADA‑ramp, shelter, and pedestrian crossing at the visitor‑center intersection. • Perform demolition, utility relocation, new storm‑drain culverts, asphalt & concrete paving, striping, and MUTCD‑compliant signage. • Provide traffic‑control, erosion‑control, and wildlife‑protection plans; comply with Buy‑American, minimum‑wage, and DEI requirements. • Small‑business set‑aside; award will be negotiated after evaluation of technical and price factors.

Attached files

Contact

Zaira Lupidi(Contracting Officer)

[email protected]

(000) 000-0000

Key dates

Opened
10/16/2026
Questions due
10/5/2026
Closes
11/3/2026
Duration
150 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
140P2026R0065

Budget estimate

$800,000 – $2,500,000

The scope involves a complete shuttle‑stop installation with roadwork, concrete, utilities, signage, and extensive environmental controls. Similar NPS shuttle‑stop projects in comparable parks have ranged from $1 M to $2.5 M depending on site conditions, material costs, and labor rates (including prevailing‑wage requirements). Assuming a mid‑range unit cost of $1,200–$2,000 per square foot of paved area plus $500 K–$800 K for structural and utility work, the total contract value is likely between $800 K and $2.5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Interior·Wyoming

Top match · 83%

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of The Interior·South Dakota

82% match

Y--Construct North Unit Visitor Center at BADL

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of The Interior·Arizona

81% match

Y--GRCA 257282 - Replace Wastewater Plant at South Ri

Closes 11/18/2026Opened 10/16/2026

U.S. Department Of The Interior·Wyoming

81% match

Y--GRTE 237343 - Rehab 4 Lazy F Ranch

Closes 11/20/2026Opened 10/5/2026

U.S. Department Of The Interior·Colorado

81% match

GRTE 237343 - Rehab 4 Lazy F Ranch

Closes 11/13/2026Opened 7/15/2026

U.S. Department Of The Interior·Colorado

80% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 6/26/2025

U.S. Department Of The Interior·Wyoming

80% match

Z--Access Road Repair National Elk Refuge

Closes 12/14/2026Opened 10/26/2026

U.S. Department Of The Interior·Utah

79% match

Portable Toilet Services - ZION National Park

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of The Interior·California

79% match

J--LAKE25-101-CC LIFT STATION PUMP REPAIR

Closes 6/6/2029Opened 6/3/2025

Oregon Parks and Recreation Department·Oregon

79% match

ITB 14564 Smith Rock State Park Visitor Improvement Project

Closes 11/17/2026Opened 10/28/2026

Ben Franklin Transit·Washington

79% match

Bus Stop Concrete Pad and Amenity Installations

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of The Interior·Arizona

79% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 7/20/2026

Maryland State Highway Administration·Maryland

79% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Town of Westwood·Massachusetts

79% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

U.S. Department Of Agriculture·Colorado

79% match

GAOA Brainard Lake Recreation Area Deferred Maintenance

Closes 12/17/2026Opened 10/28/2026

U.S. Department Of Transportation·Utah

79% match

UT NP DINO PMS(1), Pavement Preservation DINO

Closes 7/13/2028Opened 7/20/2026

U.S. Department Of Transportation·Washington

78% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 9/23/2026

U.S. Department Of Transportation·Colorado

78% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of The Interior·Oregon

78% match

Rehab Kiosk Restrooms, NPS-ORCA

Closes 11/16/2026Opened 10/27/2026

City of Moreno Valley·California

78% match

Amphitheater Park Restroom Site Improvements

Closes 11/23/2026Opened 10/27/2026

City of Pueblo·Colorado

78% match

West Side Improvements - Bus Stops Package 1

Closes 11/4/2026Opened 9/22/2026

Texas Williamson County·Texas

78% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

City of Pueblo·Colorado

78% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

Maryland State Highway Administration·Maryland

78% match

AL5105179 - MD 736 (Braddock Road) from Park Avenue to Braddock Street Sidewalks

Closes 12/3/2026Opened 10/27/2026

U.S. Department Of The Interior·Colorado

78% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026