The City of Roseville intends to award a contract for the construction of two aquifer storage and recovery wells, one at the Campus Oaks site and one at the Misty Wood site. The wells will be constructed with a design capacity of 2,500 gpm and will be used for aquifer storage and recovery. The contract was awarded to Stonehouse Drilling and Construction LLC, pending City Council approval. The project includes the construction of two wells, with a 20-inch inside diameter stainless-steel casing and a stainless-steel wire wrapped well screen. The wells will be drilled to a depth of 435 feet and 380 feet, respectively.
• The project requires the construction of two aquifer storage and recovery wells.
• The wells will be constructed with a design capacity of 2,500 gpm.
• The contract was awarded to Stonehouse Drilling and Construction LLC.
• The project includes the construction of two wells with a 20-inch inside diameter stainless-steel casing and a stainless-steel wire wrapped well screen.
• The wells will be drilled to a depth of 435 feet and 380 feet, respectively.