The WWTP Solids Handling Improvements 2019 project involves the construction of concrete lined drying bed cells, a solids processing area, and sludge drying lagoons, along with associated underdrains, piping, valves, roads, and pumping stations. The project is funded by the Town of Camp Verde Wastewater Division. The contract was awarded to Redpoint with a total bid of $2,352,180.00. Key aspects of the project include:
• Construction of eight concrete lined 146’ X 33’ drying bed cells
• Construction of a 300’ X 138’ concrete solids processing area
• Construction of two 430’ X 137’ sludge drying lagoons
• Associated underdrains, piping, valves, roads, and pumping stations
• Project funded by the Town of Camp Verde Wastewater Division