This contract involves the complete upgrade of burner and boiler control systems at the Riverside Park Water Reclamation Facility in Spokane, WA. The scope includes replacing existing Weishaupt burners with new units capable of operating on digester gas, upgrading associated gas‑line infrastructure (stainless‑steel piping, regulators, valves), modernizing pneumatic controls to electronic controls, integrating boiler controls with the facility’s SCADA system via Ethernet TCP/IP, and providing all required safety, disposal, and documentation deliverables. The City of Spokane acted as the procuring agency, issuing a competitive public‑works ITB and awarding the lump‑sum contract to McKinstry. The work must achieve substantial completion by 31 Dec 2024, with final completion no later than 31 Mar 2025, and includes a $500 per day liquidated‑damages provision for late performance. The contract is funded by the City’s public‑works budget and is subject to Washington prevailing‑wage, licensing, and insurance requirements.
• Upgrade burner hardware (Weishaupt baseline, open to alternatives) and associated gas‑line components.
• Replace and modernize control cabinets, pneumatic to electronic controls, and SCADA integration.
• Complete installation, testing, safety orientation, and disposal of legacy equipment.
• Meet all City of Spokane procurement, bonding, and insurance obligations, with a 5 % bid bond and required performance/pay‑performance bonds after award.