Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›Grant Rd. - -Palo Verde Blvd. to Swan Rd. Improvements

Awarded contract·City of Tucson·Arizona

Grant Rd. - -Palo Verde Blvd. to Swan Rd. Improvements

Won by HDR Engineering, Inc.$2.4MSingle Award
Contract source

Awarded vendors

  • HDR Engineering, Inc.

Description

The contract is for professional design services for the Grant Road: Palo Verde Boulevard to Swan Road Improvements project. The scope of work includes surveying, right-of-way acquisition, utility coordination, environmental coordination, traffic engineering, geotechnical engineering, and drainage design. The contract was awarded to HDR Engineering, Inc. for a total amount of $2,440,924.00. The project involves the improvement of Grant Road from Palo Verde Boulevard to Swan Road, including the design of new right-of-way, drainage, and utility systems. The project also includes the preparation of legal descriptions and "S" drawings for affected parcels. • The project is located in Tucson, Arizona. • The scope of work includes surveying, right-of-way acquisition, utility coordination, environmental coordination, traffic engineering, geotechnical engineering, and drainage design. • The contract was awarded to HDR Engineering, Inc. for a total amount of $2,440,924.00. • The project involves the improvement of Grant Road from Palo Verde Boulevard to Swan Road. • The project includes the design of new right-of-way, drainage, and utility systems. • The project also includes the preparation of legal descriptions and "S" drawings for affected parcels.

Attached files

Key dates

Starts
10/30/2014
Ends
4/1/2026
Duration
4155 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
541330
Solicitation №
140933 - 01

Contract value

$2,440,924

The contract value is explicitly stated as $2,440,924.00. This amount is for the professional design services provided by HDR Engineering, Inc. for the Grant Road improvement project. The value is likely based on the scope of work, which includes surveying, right-of-way acquisition, utility coordination, environmental coordination, traffic engineering, geotechnical engineering, and drainage design.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Nevada Government·Nevada

Top match · 67%

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

NYS East Fishkill, Town of·New York

67% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Town of Camp Verde·Arizona

67% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Idaho Transportation Department·Idaho

67% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

Berkeley County·South Carolina

66% match

Paslay Drive Right-Of-Way Improvements

Closes 11/30/2026Opened 10/27/2026

Nevada Government·Nevada

65% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Clark County·Nevada

65% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

City of Rancho Cordova·California

65% match

Rancho Cordova Complete Streets Implementation Guide

Closes 11/13/2026Opened 10/9/2026

City of Elk Grove·California

64% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

Clark County·Nevada

64% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Pueblo·Colorado

64% match

West Side Improvements - Bus Stops Package 1

Closes 11/4/2026Opened 9/22/2026

City of Rancho Palos Verdes·California

64% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

County of San Luis Obispo·California

64% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Stillwater·Oklahoma

64% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

City of Tucson·Arizona

64% match

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026Opened 8/19/2026

City of Austin·Texas

63% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

City of San Antonio·Texas

63% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Austin·Texas

63% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Nevada Government·Nevada

63% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Charlotte·North Carolina

63% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Virginia Department of Transportation·Virginia

63% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

California Department of Transportation·California

63% match

Construct GSRD, DPPIA and install irrigation system.

Closes 12/8/2026Opened 10/19/2026

City of El Paso De Robles·California

63% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

NYS Washington, Town of·New York

63% match

Oak Summit Road Over Sprout Creek Culvert Replacement

Closes 11/17/2026Opened 10/19/2026

Lexington County·South Carolina

63% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026