This contract is for lead abatement work at 1066 Fairbanks in Akron, Ohio. The work includes interior and exterior tasks such as removing and replacing windows, doors, and trim, as well as enclosing walls and stairwells with drywall. The contractor must follow all applicable local building codes and regulations, including OSHA and HUD guidelines. The contract has a duration of 30 days and the lead work must be completed within 5-7 days of relocation date. The contractor must also follow COVID protocols and provide a final clean in accordance with HUD and CDC guidelines.
• The contract includes tasks such as removing and replacing windows, doors, and trim
• The contractor must follow all applicable local building codes and regulations
• The contract has a duration of 30 days
• The lead work must be completed within 5-7 days of relocation date
• The contractor must follow COVID protocols and provide a final clean in accordance with HUD and CDC guidelines
• The contract includes a final clean in accordance with HUD and CDC guidelines for COVID