The Montana Department of Transportation (MDT) is seeking bids for the production and stockpiling of sanding material for the Bozeman area. The contract requires the contractor to provide all labor, materials, equipment, and incidentals necessary to produce 4,500 tons or 3,000 cubic yards of sanding material. The contractor must also add 25% contractor-furnished salt by weight to the sanding material. The contract includes specifications for the sanding material, salt, and equipment, as well as requirements for measurement and payment, partial payment, and additional work. The contract also includes a preconstruction conference and a dispute resolution process.
• The contract is for the production and stockpiling of sanding material for the Bozeman area.
• The contractor must provide all labor, materials, equipment, and incidentals necessary to produce 4,500 tons or 3,000 cubic yards of sanding material.
• The contractor must add 25% contractor-furnished salt by weight to the sanding material.
• The contract includes specifications for the sanding material, salt, and equipment.
• The contract requires measurement and payment based on the quantity of material produced.
• The contract allows for partial payment for material delivered and stockpiled at the project site.
• The contract includes a preconstruction conference and a dispute resolution process.