This contract covers the upgrade of the control system for Elevator #6 in the Outagamie County Justice Center. The scope includes replacing the hydraulic elevator’s micro‑processor‑based controller, door operator, soft starter, key‑switches, and associated wiring, while retaining the existing hydraulic power unit. The work must meet ASME A17.1, ADA, and local codes, include a one‑year warranty, and be completed by December 5 2025 (substantial) with a final completion deadline of December 15 2025. The County requires a 5 % bid bond, performance and payment bonds equal to the contract sum, and extensive insurance coverage; the winning vendor is Schindler Elevator, awarded a contract valued at $120,153.
• Upgrade of elevator controls, door operator, and related electrical components
• Must integrate with existing power unit and central control interface, and comply with emergency‑power and ADA requirements
• Strict schedule (no weekend work, noise restrictions), one‑year warranty, and $100/day liquidated‑damages for late substantial completion.