The contract is for the replacement of the wave pool at Bunker Beach Water Park, including the removal and replacement of the existing wave pool, lagoon expansion, and boiler system. The project also includes general construction for new family changing room and maintenance facility structures, septic system installation, and seven alternates for various asset preservation items. The contract was awarded to multiple vendors, including Donlar Construction, VersaCon, Ebert Construction, and Global Specialty. The total value of the contract is estimated to be around $10 million, based on the bid tabulations.
• The project consists of three categories: Category 1 - Restroom and Maintenance Buildings, Category 2 - Wave Pool Replacement, and Category 3 - Septic System.
• The contract includes multiple alternates, including the replacement of equipment, concession building ventilation, and additional excavation of unsuitable soils.
• The vendors were selected based on their bids, which included base bids and unit prices for various items.
• The contract is expected to be completed within a certain timeframe, although the exact duration is not specified.