This contract concerns the interior renovation of the third‑floor east side of the City of Mobile’s 200 Government Street office building. The scope includes selective demolition, new metal stud framing, rough and finish carpentry, gypsum board, resilient flooring, paint, fire‑sprinkler upgrades, full HVAC system installation, and complete electrical service, all performed under a stipulated‑sum, fixed‑price contract. The City required a 15 % DBE participation threshold, performance and labor‑material bonds, E‑Verify compliance, and a $10,000 allowance for unforeseen conditions. The winning vendor, Rogers & Willard, Inc., was awarded the contract for $572,576.00, with bids due by 2:15 p.m. on 25 Jan 2023 and construction to be completed within 90 calendar days from the Notice‑to‑Proceed.
• Scope: demolition, metal‑stud framing, HVAC, fire‑sprinkler, electrical, finishes.
• Contract type: stipulated‑sum (fixed‑price) with $10k contingency.
• Key requirements: DBE 15 % participation, surety bonds, E‑Verify, tax‑exempt bidding.