Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Church St & Nott St Water Main Replacement Project (9% SLBE)

Awarded contract·The Metropolitan District·Connecticut

Church St & Nott St Water Main Replacement Project (9% SLBE)

Won by Baltazar Contractors, Inc.$3.1MAwarded 6/1/2020Single Award
Contract source

Awarded vendors

  • Baltazar Contractors, Inc.

Description

This contract awards the construction of a new water main system in Wethersfield, Connecticut, including trenchless installation of steel sleeves at two railroad crossings and related support equipment. The scope covers all labor, equipment, permits, and ancillary services required to complete the water main and service installations. Bidders were required to hold a 10 % bid security, possess DAS contractor pre‑qualification certificates for water and sewer lines, and attend a mandatory pre‑bid conference on February 20, 2020. The contract was awarded to Baltazar Contractors, Inc. for a lump‑sum price of approximately $3.1 million. • Scope: new water mains, trenchless steel sleeves, trenchless techniques, support equipment. • Requirements: DAS pre‑qualification, 10 % bid security, mandatory pre‑bid conference attendance. • Award: Single‑source award to Baltazar Contractors, Inc. with a lump‑sum value of $3,096,785.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
3/18/2020
Intent to award
6/1/2020
Awarded
6/1/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
2019B-02

Contract value

$3,096,785

The award record lists a LumpSumItemAward_UnitPriceOverride of 3,096,785, which is interpreted as the contract’s total lump‑sum price. No additional change orders or options are noted, so the contract value is estimated at approximately $3.1 million. This figure aligns with typical costs for a municipal water‑main replacement project of this magnitude, covering materials, labor, trenchless installation, and associated engineering services.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Oregon Tualatin Valley Water District·Oregon

Top match · 72%

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Lake City and City of Bellechester·Minnesota

71% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Massachusetts Town of Westborough·Massachusetts

71% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Saint Peter·Minnesota

71% match

Saint Peter, City of 2026 Lead Service Line Replacement BMI No. 26X.142592

Closes 11/13/2026Opened 10/16/2026

City of Bellevue·Washington

71% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Catawba Regional Council of Governments·South Carolina

71% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Edgewater, FL·Florida

70% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Western Virginia Water Authority·Virginia

70% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of DeLand·Florida

70% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Massachusetts Town of Plymouth·Massachusetts

70% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

Hastings Utilities·Nebraska

70% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Charlotte·North Carolina

70% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

U.S. Department Of Agriculture·Utah

69% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Georgia City of Cartersville·Georgia

69% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Waukegan·Illinois

69% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Connecticut Town of Waterford·Connecticut

69% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

City of Anderson, SC·South Carolina

69% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

Goodwyn Mills Cawood·Georgia

69% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

NYS Alden, Town of·New York

69% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

Santa Maria-Bonita School District·California

68% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

68% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Northern Kentucky Water District·Kentucky

68% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Northern Kentucky Water District·Kentucky

68% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

Riverton City·Utah

68% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Gwinnett County Government·Georgia

68% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026