The contract is for the removal and replacement of approximately 6 feet of 10-inch storm sewer main at the Rainey Star Center. The scope of work includes all associated labor and materials, but excludes design or structural engineering, test and balance of systems, and any additional items not associated with this work. The contract was awarded to Bentzel Mechanical, Inc. for a total of $14,950. The work is to be performed during the week between Christmas and New Year's Eve. Key points to consider:
* The contract is for a specific scope of work, with clear inclusions and exclusions.
* The contract was awarded to a single vendor, Bentzel Mechanical, Inc.
* The contract has a fixed price of $14,950.
* The work is to be performed during a specific time period.
* The contract does not include design or structural engineering, test and balance of systems, or any additional items not associated with this work.