The Kent East Hill Demolition Project involves the interior demolition of existing finishes and non-structural partitions, as well as minor exterior demolition of a trellis at the entry and sign structure on the west sloped roof. The project site is located at 20500 108th Ave SE, Kent, WA 98031. The contract was awarded to 3 Kings Environmental, Inc. with a base bid of $80,450.00.
• The project requires the demolition of existing finishes and non-structural partitions
• The project site is located at 20500 108th Ave SE, Kent, WA 98031
• The contract was awarded to 3 Kings Environmental, Inc.
• The base bid for the contract was $80,450.00