Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Water and Wastewater
  5. ›Zone 41 Mingus Pump Station, Tank and Pipeline (24PW022)

Awarded contract·City of Prescott·Arizona

Zone 41 Mingus Pump Station, Tank and Pipeline (24PW022)

Won by Technology Construction, Inc.$10.1MAwarded 11/5/2024Single Award
Contract source

Awarded vendors

  • Technology Construction, Inc.

Description

This contract calls for the design‑build replacement of the Mingus Pump Station, the demolition of existing water‑storage infrastructure, and installation of a new 750,000‑gallon steel storage tank, associated water‑main and pipeline upgrades, civil site work, road and drainage improvements, and full mechanical‑electrical‑instrumentation outfitting for the City of Prescott, Arizona. The scope includes civil grading, asphalt paving, concrete curbs, storm‑drain construction, installation of four 60 hp centrifugal pumps, a 2,000‑gal surge tank, and extensive utility coordination. The project is funded in part by the Water Infrastructure Finance Authority and is subject to Davis‑Bacon prevailing‑wage, American Iron & Steel, DBE outreach, E‑Verify, and other federal, state, and local compliance requirements. The contract is a fixed‑price, not‑to‑exceed agreement with a 420‑day performance window beginning the week of 18 Nov 2024. • Replace aging pump station, install new 750 MG tank, and upgrade water‑pipeline network. • Comprehensive civil works: road excavation, asphalt pavement, curbs, sidewalks, drainage, rip‑rap, and erosion control. • Mechanical & electrical systems: four vertical inline pumps, surge tank, control panels, HVAC, and instrumentation. • Compliance: WIFA financing, prevailing‑wage, AIS, DBE, E‑Verify, insurance, bonding, and warranty requirements.

Attached files

Key dates

Bids closed
9/19/2024
Intent to award
11/5/2024
Awarded
11/5/2024
Contract modified
9/16/2024
Starts
11/18/2024
Ends
1/13/2026
Duration
420 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
24PW022

Contract value

$10,147,000

The bid opening record lists two competing bids: Technology Construction at $10,147,605.50 and Farn Environmental at $10,267,410.55. The awarded vendor (Technology Construction) therefore secured a contract approximating $10.15 million. The bid packet also shows a $900,000 allowance for traffic control and a $900,000 contract allowance, suggesting the total project value is in the $10‑$11 million range. Consequently, a reasonable estimate for the contract’s worth is about $10.2 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·United States of America

Top match · 67%

29--PUMP,FUEL,METERING AND

Closes 11/5/2026Opened 10/22/2026

City of Stillwater·Oklahoma

67% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

Michigan Department of Transportation – Contract Services Division – Purchasing·Michigan

66% match

Septic Tank & Vault Pumping Services - MDOT Grand Region

Closes 11/12/2026Opened 10/23/2026

Dickenson County·Virginia

65% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Town of Babylon·New York

65% match

BID# 26G53 - CONSTRUCTION OF AUXILIARY PUMP & PUMP STATION AT CELL 7

Closes 11/5/2026Opened 10/21/2026

Town of Byhalia·Mississippi

65% match

Natural Gas Services for Marshall Trade Center

Closes 12/2/2026Opened 10/29/2026

Michigan Department of Transportation·Michigan

64% match

Septic Tank & Vault Pumping Services - MDOT Grand Region

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

64% match

29--PUMP,FUEL,METERING AND

Closes 11/4/2026Opened 10/21/2026

City of Meriden·Connecticut

64% match

RFP027-34 Platt & Lincoln Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

64% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

Massachusetts Town of Nantucket·Massachusetts

64% match

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Delaware

64% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

64% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

U.S. Department Of Defense·Michigan

64% match

Pump Unit, Hydraulic

Closes 11/3/2026Opened 10/15/2026

City of Hilliard, Ohio·Ohio

64% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

Muscatine Power and Water·Iowa

64% match

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 11/11/2027Opened 9/1/2026

City of Shawnee·Kansas

64% match

Ordinance No. 3479

Closes 1/16/2029Opened 1/16/2024

New York City Department of Environmental Protection·New York

64% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

U.S. Department Of Defense·Kansas

64% match

Fort Leavenworth Underground Fuel Tank Testing and Repair Services

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·Oklahoma

64% match

29--VALVE,FUEL PUMP

Closes 11/5/2026Opened 10/29/2026

New York City Department of Environmental Protection·New York

64% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

U.S. Department Of Defense·Nebraska

64% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Veterans Affairs·New Jersey

64% match

J045--RFQ - FY 27 - Petroleum Bulk Storage Tank Maintenance (B+4)

Closes 11/9/2026Opened 10/23/2026

Town of Tyrone·Georgia

64% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

U.P. Engineers & Architects, Inc·Michigan

64% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026