This contract calls for the design‑build replacement of the Mingus Pump Station, the demolition of existing water‑storage infrastructure, and installation of a new 750,000‑gallon steel storage tank, associated water‑main and pipeline upgrades, civil site work, road and drainage improvements, and full mechanical‑electrical‑instrumentation outfitting for the City of Prescott, Arizona. The scope includes civil grading, asphalt paving, concrete curbs, storm‑drain construction, installation of four 60 hp centrifugal pumps, a 2,000‑gal surge tank, and extensive utility coordination. The project is funded in part by the Water Infrastructure Finance Authority and is subject to Davis‑Bacon prevailing‑wage, American Iron & Steel, DBE outreach, E‑Verify, and other federal, state, and local compliance requirements. The contract is a fixed‑price, not‑to‑exceed agreement with a 420‑day performance window beginning the week of 18 Nov 2024.
• Replace aging pump station, install new 750 MG tank, and upgrade water‑pipeline network.
• Comprehensive civil works: road excavation, asphalt pavement, curbs, sidewalks, drainage, rip‑rap, and erosion control.
• Mechanical & electrical systems: four vertical inline pumps, surge tank, control panels, HVAC, and instrumentation.
• Compliance: WIFA financing, prevailing‑wage, AIS, DBE, E‑Verify, insurance, bonding, and warranty requirements.