The Outagamie County Justice Center is upgrading the control systems for up to four hydraulic elevators (two public elevators and two secure‑area elevators). The scope includes supplying and installing new control panels, wiring, and optionally new hydraulic power units, with strict requirements for code compliance, emergency‑generator integration, and limited downtime. The project is a sealed‑bid, competitive procurement with a base‑bid award to Schindler at approximately $412 k and an alternate bid option that could raise the total to about $420 k. The work must be completed by March 28 2025, with liquidated damages of $100 per day for late completion. Key contract documents include the Request for Bid, an Elevator Modification Manual, existing power‑unit photographs, and AIA A101/A201 contract forms, all requiring the contractor to provide performance and payment bonds, insurance, and a one‑year warranty.
• Upgrade of elevator control panels, wiring, and optional hydraulic power units for four elevators.
• Base‑bid award to Schindler (≈ $412,131) with an alternate bid ceiling of ≈ $420,236.
• Mandatory compliance with ASME A17.1, ADA, and County safety/insurance requirements; completion deadline March 28 2025.