The City of Richland is seeking a contractor to furnish all materials and provide labor, tools, and equipment necessary to perform all work required for the construction of additions to the existing Snyder Substation. The work includes tapping the existing 115 kV ring bus, adding a 115 kV circuit switcher, and installing a 115-12.47/7.2 kV power transformer. The contract was awarded to Prater Electric, Inc., Potelco Inc, and Christensen Electric. The contract document provides the original bid prices and corrected prices for each vendor. The project requires the contractor to provide all necessary materials, labor, and equipment to complete the work, including excavation, grading, and installation of electrical equipment. The contractor must also ensure that all work is performed in accordance with the technical specifications and project drawings.