This municipal contract covers the design‑build installation of a prefabricated steel storage building for the Yakima Kiwanis Park maintenance facility. The scope includes site mobilization, grading and preparation, delivery and erection of a 40‑ft × 30‑ft steel structure, installation of electrical service conduit, and a minor change item. The award was made to Barn Masters, LLC for a total contract value of approximately $152,460 (including Washington state sales tax). The procurement process was a competitive bid with multiple local contractors, and the City of Yakima selected the lowest responsive bidder.
• Scope: mobilization, site prep, steel building erection, electrical conduit, minor change.
• Awarded Vendor: Barn Masters, LLC (local Yakima contractor).
• Contract Value: ~$152 K (lump‑sum, inclusive of tax).
• Procurement: Full and open competition; award based on lowest compliant bid.