The contract is for the repair of drywall at the Kekaha Landfill. The scope of work includes drywall installation, tape and texture application, and painting. The contract was awarded to DKI808 LLC for a total price of $124,602.66. The project involves the repair of existing drywall, installation of new drywall, and painting to match the existing color. The contract also includes additive alternates for shop building and administrative building work. The key aspects of the contract include the scope of work, the awarded vendor, and the total contract price.
• The scope of work includes drywall installation, tape and texture application, and painting.
• The contract was awarded to DKI808 LLC for a total price of $124,602.66.
• The project involves the repair of existing drywall, installation of new drywall, and painting to match the existing color.
• The contract also includes additive alternates for shop building and administrative building work.