The contract is for the excavation of Module 5, Phase C, at the Neal Road Recycling and Waste Facility in Butte County, California. The work includes clearing and grubbing, traffic control, excavation of native lahar, sandstones, and refuse and soil, removal of existing storm water drainage structures, relocation of existing storm water drainage structures, and relocation of existing HDPE piping. The contract has an engineer's estimate of $1,635,725.00. The bidders include DeSilva Gates Construction LP, RCI General Engineering, Goodfellow Bros., Innovative Construction Solutions, Ford Construction Co., Inc., Stimpel-Wiebelhaus Assoc., Inc., C&D Contractors, Inc., Nichelini General Eng. Contractors, Anderson Dragline, Inc., Franklin Construction, Inc., Wood Bros., Inc., and Eddie Axner Construction, Inc.
• The contract is for a public works project in California.
• The work includes excavation, traffic control, and storm water drainage structure relocation.
• The contract has an engineer's estimate of over $1.6 million.
• There are 12 bidders listed for the contract.
• The contract is administered by the County of Butte - Public Works.